![Parade Float Preparations update - 18 February 2025-[IMG=L5N]
Here's the latest Parade Preparation update.
⠀
⠀
[BU]Costuming](https://image.staticox.com/?url=https%3A%2F%2Fpa1.aminoapps.vertvonline.info%2F9299%2F23f383243dd0e48f5755f11404e25a7d01c86448r1-750-1000_hq.gif)
Here's the latest Parade Preparation update.
⠀
⠀
Costuming
Foundation dress
Dress has been washed.
Requires an iron.
95% Complete :negative_squared_cross_mark:
⠀
Tail
100% Complete :white_check_mark:
⠀
Wings
100% Complete :white_check_mark:
⠀
Claw spats/gaiters
Additional length was cut and sewn.
The claws will be lengthened if there are sufficient materials but this won't be determined until after the mask is made.
50% Complete :negative_squared_cross_mark:
⠀
Phoenix Beak Mask
Added crest to the top headpiece (glued then sewed).
Designed, created and added eye shadow piece to mask headpiece.
Sealed inner eye area with black cloth tape.
100% Complete :white_check_mark:
⠀
Backpack
100% Complete :white_check_mark:
⠀
Props
Prop Tray
Build prop tray.
No work has yet commenced.
0% Complete :x:
Create attachment to prop tray.
No work has yet commenced.
0% Complete :x:
Phoenix Mascot
Attached tail.
Added neck feathering. Added eyes.
Added to wing attachment strength and system to lock in place wings in upright flight pose.
Created claws (took hours, not yet attached).
95% Complete :negative_squared_cross_mark:
⠀
Signage
Main messaging
Sign to be printed / constructed.
Sign to have water-resistence covering applied.
No work has yet commenced.
0% Complete :x:
Prop tray messaging
Signs to be printed / constructed.
Signs to have water-resistence covering applied.
Signs to be attached to prop tray.
No work has yet commenced.
0% Complete :x:
⠀
Float
The float sign is a sign provided to every float, which has their organisation/individual name (as applicable), marshalling location and Parade number.
Since this is only collected once at registration on Parade day (evening), no work can be done with this until at the Marshalling Area immediately prior to the Parade.
This will require holes to be drilled and signage/props attached.
0% Complete :x:
⠀
⠀⠀
A lot done but a lot more still to go, with the Parade twelve (12) evenings away.
Slowly making good progress.
Stay tuned for further updates.
Comment