It's been a few months since the Parade application was approved and no work has been done on the float.
The Parade is under seven weeks away.
This is really cutting it fine.
Some supplies were purchased yesterday, though when researching, some items appeared much bigger online than in reality.
Some on-the-spot alternative planning and purchasing above the expected amount were essential.
Here's our first task update.
⠀
⠀
Costuming
Foundation dress
The dress already exists. No production required.
Illuminated lettering was removed some months ago.
Requires a wash and iron.
90% Complete :negative_squared_cross_mark:
⠀
Tail
Requires extensions to be produced and sewn on to existing tailpiece.
Requires front belt section to be re-created and attached.
0% Complete :x:
⠀
Wings
Requires entire reconfiguration to make existing wings lighter in weight, stronger and able to hold itself up.
0% Complete :x:
⠀
Claw spats/gaiters
Add some additional length with the same fabric.
0% Complete :x:
⠀
Phoenix Beak Mask
Entire new full face piece to be constructed.
0% Complete :x:
⠀
Backpack
Modify existing backpack to re-expose wing attachment s in a new way.
0% Complete :x:
⠀
Props
Prop Tray
0% Complete :x:
Phoenix Mascot
Create phoenix mascot model.
Apply protective layer.
Create attachment to prop tray.
0% Complete :x:
⠀
Signage
Main messaging
Sign to be printed / constructed.
Sign to have water-resistence covering applied.
0% Complete :x:
Prop tray messaging
Signs to be printed / constructed.
Signs to have water-resistence covering applied.
Signs to be attached to prop tray.
0% Complete :x:
⠀
Float
The float sign is a sign provided to every float, which has their organisation/individual name (as applicable), marshalling location and Parade number.
Since this is only collected once at registration on Parade day (evening), no work can be done with this until at the Marshalling Area immediately prior to the Parade.
This will require holes to be drilled and signage/props attached.
0% Complete :x:
⠀
⠀⠀
As you can see, quite a bit of work to do in very little time.
Stay tuned for further updates.